The hole where the tub used to be
The walls stripped to the stud
The tile below
This whole process has been very exciting and interesting, before the remodel there was a step up in our bathroom to get to the tub, toilet and shower area, they did this because this area was not intended to be bathroom area in the original design. This room used to be a closet with a tile rug design which you can see in the picture above. They raised it up a step to hide all the plumbing, they also hid all the scrap stuff from construction in there instead of throwing it away. This is day 4 Monday.
No comments:
Post a Comment